Cliff’s Diary of his Train4TradeSkills Practical Training – Part 4

Monday:

 

I am back in Featherstone for week 4 of my practical training there are not so many students this week and I am in a group of three. Our main task for the week is an airing cupboard fitting a hot water storage cylinder, feed and expansion tank also running a single hot feed to a hand basin.

 

This is part of the requirement for city & guilds 6129 course and is assessed but there is no photo and summary required. You can have two attempts to complete this task but if you are happy with your first install it is not necessary and you can move on to other things.

 

We don’t need a materials list for this task so it’s straight to work on the install. We can install this system any way we see fit and the only information given is that we must use as many machine bends as possible so as not to slow the flow of water.

 

This is quite a task as a great deal of the pipe work is in 22mm which is difficult to bend by hand, but after last week’s LCS I am feeling pretty pumped up and find it less difficult than my first attempts with 22mm pipe.

 

By lunchtime I am well into the install and have the feed and expansion tank completed and the feed to the cylinder also. After a catch up with the other students over lunch were back to work fitting the primary vent pipe which is the most complex of all the bends as it has a bridge, offset and two 90 ̊ bends all in one piece of 22mm tube. This takes the best part of an hour to work out and pull accurately but once complete the rest is plain sailing and by the end of the afternoon I have the system filled with water and soundness tested

 

Tuesday:

 

Having soundness tested the install the previous day and left the system filled overnight, Robert our tutor assessed the install and passed it with some nice comments on neatness and the quality of the bends and said that it was not necessary for me to do a second install and that I could decommission and move on.

 

The decommission takes a long time as there is a large quantity of water in the system so the morning soon passes. During lunch I spent some time with a group of students on their first week of training and am able to give some advice on what to expect during the week and hopefully helped them to avoid some of the mistakes people were making when I was there for week 1.

 

This was good because it allowed me to realise just how beneficial the first weeks were to me and how much I had retained to memory. In the afternoon Robert did air testing drainage systems with me and I got acquainted with a manometer, I also did two test papers ready for the exams the following day which I failed miserably much to my disgust, so out came the books and I spend the rest of the day doing some serious revision in the canteen.

 

Wednesday:

 

Feeling pretty tired today. I did another 2 hours revision when I got home last night and am just hoping I haven’t done too much and bamboozled myself with facts and figures.

 

I am given another task by Robert a Soil and Waste fit in one of the bays. It’s not a long task but there are two photo’s, a written summary and a materials list needed for this task. It really helps me clear my head and distracts me from worrying about the exams as I excel in the practical parts of the course.

 

And I am feeling much more relaxed by lunch. During lunch talking with fellow students I realise it’s not only me who has been dreading exam everyone failed the mocks and spent a long night of revision but are now all feeling pragmatic about them pass or fail, my own attitude is failure is NOT an option.

 

1pm: Exam time today we have Sanitation systems and Central Heating Systems both are about 30 questions multiple choice and computer based with about 60mins allocated for each which again is more time than is necessary and even spending lots of time over the papers I’m out within the hour relieved that there over with.

 

The rest of the day is to be a Rain Water System install again not a very long task but photo’s, materials list and a written summary is required for my portfolio, the install only take 30mins and the remainder of the day is spent doing materials lists and summaries for the last two tasks. We get our results from our exams quite late in the afternoon and I’m very pleased to say I passed both – CHUFFED!!!

 

Thursday:

 

Today is about getting my portfolio up to date and making sure everything is signed and dated correctly. Absolutely everything has to be signed and counter signed by the tutors, so Robert spends a whole morning going through our files with us, he also dose some talks on Solvents, Scaffolding Erection and The Safe Use Of Power Tools so that they can also be signed as completed.

 

He has also given us a talk on what to expect on our final two weeks and it sound like it’s going to be very intense with lots of summaries to do. I am all up to date with everything completed so there is no need for me to attend for the Friday. Friday’s seem to be for resit’s of exams and also any work that needs to be completed, so far I haven’t needed to attend on Fridays hope I can continue in that manner.

 

Hope you have enjoyed the read I have 4 more TMA’s to complete the level 2 then 2 more weeks practical so am hoping to be back with parts 5 & 6 of the diary soon.

 

 

To see photos from Week 4 of his practical training and read his other diaries, visit Cliff’s blog at www.plumbing-student.blogspot.com

Advertisements

About Train4tradeSkills

Train4TradeSkills offer the only trade training skills courses that combine three great ways to learn, through a unique blend of book based theory, practical workshops and virtual reality PC based training, to help you qualify you as a plumber, electrician or gas engineer. No other learning provider offers our unique way to study, with full tutor support, easy to follow, step by step modules. Once you complete one part of the course and return your work for marking, the next stage of the course automatically follows. It’s as easy as that. It’s fun, it’s easy to follow... and it can be fitted around your existing work and family commitments!

Posted on July 12, 2011, in plumbing, plumbing courses, plumbing jobs, Plumbing News, t4ts, train4tradeskills, Train4TradeSkills Bright Sparks and tagged , , , , , , , , , , , , , , , , , , , , . Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: